We've been listening to you. Try phase 2 of our updated 511 website and let us know what you think. X
Iowa DOT Logo IADOT ISP
Reports on US 18
US 18
Between County Road L58 and County Road M12 (near Hartley). The road is closed due to road construction work. There is a length limit in effect. A detour is in operation. Vehicle length limit 120 ft. Until October 8, 2020 at about 2:00PM CDT.
Between County Road B30 and US 218; County Road T44 (near Floyd). The roadway is reduced to one lane due to road construction work. There is a width limit in effect. Width limit 16'0". Until August 20, 2020 at about 5:00PM CDT.
Between County Road V18 and IA 24; US 63 (near New Hampton). Expect single line traffic alternating directions due to bridge construction work. Look out for temporary traffic lights. There is a height limit in effect. Height limit 15'0". Until July 31, 2020 at about 5:30PM CDT.
Between IA 76 and the Mississippi River bridge (Marquette). Expect single line traffic alternating directions due to road construction work. Look out for temporary traffic lights. There is a height limit in effect. There is a width limit in effect. Width limit 15'0". Height limit 15'0". Until October 30, 2020 at about 2:00PM CDT.
At IA 76 (Marquette). The exit ramp is closed due to road construction work. A detour is in operation. Permitted oversize loads are prohibited. Until October 30, 2020 at about 2:00PM CDT.