Iowa DOT Logo IADOT ISP
US 18: Algona - Wesley to Charles City
US 18 in both directions: Roadway reduced to one lane, due to road construction work, width limit in effect, length limit in effect.
Between County Road R70 and I-35; IA 122 (Clear Lake). The roadway is reduced to one lane due to road construction work. There is a width limit in effect. There is a length limit in effect. Width limit 12'0". Vehicle length limit 80 ft. Until November 15, 2019 at about 5:00PM CDT.
Switch to Winter Driving Conditions
Switch to Truck Restrictions
Reports on US 18: Algona - Wesley to Charles City
Map of Reports on US 18 Between County Road R70 and I-35; IA 122 (Clear Lake). The roadway is reduced to one lane due to road construction work. There is a width limit in effect. There is a length limit in effect. Width limit 12'0". Vehicle length limit 80 ft. Until November 15, 2019 at about 5:00PM CDT.
US 18 in both directions: Roadway reduced to one lane, due to road construction work, width limit in effect, length limit in effect.
Google Static Map Image
Closure Closure Restriction Restriction Warning Warning

Lane Closure Lane Closure Construction Construction Info Info
Moderate Traffic Waze: Moderate Traffic Heavy Traffic Waze: Heavy/Standstill Traffic Accident Waze: Accident

Closure Waze: Closure Open Ferry Service Operating Closed Ferries Out of Service