Iowa DOT Logo IADOT ISP
Reports on US 18
Map of Reports on US 18 Between IA 60 (Sheldon) and US 59 (Sanborn). Expect single line traffic alternating directions due to road construction work. Look out for flaggers. From 7:00AM CDT to 7:00PM CDT on weekdays. Until Thursday, at about 2:00PM CDT. Between US 69 (Garner) and IA 122; I-35 (Clear Lake). The roadway is reduced to one lane due to road construction work. A pilot car is in operation. Look out for flaggers. Until Thursday, at about 5:00PM CDT. Between County Road R70 and IA 122; I-35 (Clear Lake). The roadway is reduced to one lane due to road construction work. There is a width limit in effect. There is a length limit in effect. Width limit 12'0". Vehicle length limit 80 ft. Until November 15, 2019 at about 5:00PM CDT. Between County Road B64 (Clermont) and IA 51 (Postville). Expect single line traffic alternating directions due to road construction work. A pilot car is in operation. Look out for flaggers. Until October 25, 2019 at about 7:00PM CDT.
US 18 in both directions: Single line traffic - alternating directions, due to road construction work, look out for flagger.
US 18 in both directions: Roadway reduced to one lane, due to road construction work, pilot car in operation, look out for flagger.
US 18 in both directions: Roadway reduced to one lane, due to road construction work, width limit in effect, length limit in effect.
US 18 in both directions: Single line traffic - alternating directions, due to road construction work, pilot car in operation, look out for flagger.
Google Static Map Image
Closure Closure Restriction Restriction Warning Warning

Lane Closure Lane Closure Construction Construction Info Info
Moderate Traffic Waze: Moderate Traffic Heavy Traffic Waze: Heavy/Standstill Traffic Accident Waze: Accident

Closure Waze: Closure Open Ferry Service Operating Closed Ferries Out of Service