We've been listening to you. Try phase 2 of our updated 511 website and let us know what you think. X
Iowa DOT Logo IADOT ISP
Road Reports
US 34 Whole Road 7 reports
Glenwood to Osceola No reports
Osceola to Ottumwa 1 report
Ottumwa to Burlington 6 reports
Reports on US 34
Map of Reports on US 34 Between Vine St and N Quincy Ave (Ottumwa). The right lane is closed due to road construction work. Until September 30, 2020 at about 5:00PM CDT. Between Wintergreen Blvd and Exit 229: Bus. US 34 (Rome). There are alternating lane closures due to road construction work. Until October 15, 2020 at about 1:00PM CDT. Between Exit 229: Bus. US 34 and Wintergreen Blvd (Rome). The roadway is reduced to one lane due to road construction work. There is a width limit in effect. Width limit 14'0". Until September 29, 2020 at about 1:00PM CDT. Between Exit 262B: Central Avenue and the Mississippi River bridge (Burlington). The right lane is closed due to road construction work. There is a width limit in effect. Width limit 11'0". Until October 26, 2020 at about 1:00PM CDT.
US 34 westbound: Right lane closed, due to road construction work.
US 34 eastbound: Alternating lane closures, due to road construction work.
US 34 westbound: Roadway reduced to one lane, due to road construction work, width limit in effect.
US 34 in both directions: Right lane closed, due to road construction work, width limit in effect.
US 34 eastbound: Exit ramp closed, due to road construction work, detour in operation, see map for detour(s).
US 34 eastbound: Entrance ramp closed, due to road construction work.
US 34 westbound: Exit ramp closed, due to road construction work, detour in operation, see map for detour(s).
Google Static Map Image
Closure Closure Restriction Restriction Warning Warning

Lane Closure Lane Closure Construction Construction Info Info
Moderate Traffic Waze: Moderate Traffic Heavy Traffic Waze: Heavy/Standstill Traffic Accident Waze: Accident

Closure Waze: Closure Open Ferry Service Operating Closed Ferries Out of Service