Iowa DOT Logo IADOT ISP
Reports on US 18
Map of Reports on US 18 Between IA 4 and County Road N60 (Emmetsburg). The right lane is closed due to road construction work. There is a width limit in effect. Width limit 14'0". Until October 24, 2019 at about 2:00PM CDT. Between County Road P30 and US 169 (Algona). The roadway is reduced to two lanes due to road construction work. There is a width limit in effect. Width limit 11'0". Until November 19, 2019 at about 6:00PM CDT. Between County Road R70 and I-35; IA 122 (Clear Lake). The roadway is reduced to one lane due to road construction work. There is a width limit in effect. There is a length limit in effect. Width limit 12'0". Vehicle length limit 80 ft. Until November 15, 2019 at about 5:00PM CDT. Between County Road B64 (Clermont) and IA 51 (Postville). Expect single line traffic alternating directions due to road construction work. A pilot car is in operation. Look out for flaggers. Until October 25, 2019 at about 7:00PM CDT.
US 18 in both directions: Right lane closed, due to road construction work, width limit in effect.
US 18 in both directions: Roadway reduced to two lanes, due to road construction work, width limit in effect.
US 18 in both directions: Roadway reduced to one lane, due to road construction work, width limit in effect, length limit in effect.
US 18 in both directions: Single line traffic - alternating directions, due to road construction work, pilot car in operation, look out for flagger.
Google Static Map Image
Closure Closure Restriction Restriction Warning Warning

Lane Closure Lane Closure Construction Construction Info Info
Moderate Traffic Waze: Moderate Traffic Heavy Traffic Waze: Heavy/Standstill Traffic Accident Waze: Accident

Closure Waze: Closure Open Ferry Service Operating Closed Ferries Out of Service