Try phase 1 of our updated 511 website and let us know what you think. X
Iowa DOT Logo IADOT ISP
US 34
US 34 eastbound: Right lane closed, due to road construction work, width limit in effect. Width limit 12'0".
Between Nebraska State Line and I-29 (1 to 2 miles west of the Pacific Junction area). The right lane is closed due to road construction work. There is a width limit in effect. Width limit 12'0". Until September 30, 2020 at about 5:00PM CDT.
US 34 in both directions: Alternating lane closure, due to road construction work, pilot car in operation, look out for flagger, width limit in effect. Width limit 16'0".
Between County Road M16 (Hastings) and US 59 (Emerson). There are alternating lane closures due to road construction work. A pilot car is in operation. Look out for flaggers. There is a width limit in effect. Width limit 16'0". From 7:00AM CDT to 6:00PM CDT on weekdays and Saturday. Until April 23, 2020 at about 3:00PM CDT.
US 34 in both directions: Alternating lane closure, due to road construction work, width limit in effect. Width limit 14'6".
Between Exit 262B: Central Avenue and the Mississippi River bridge (Burlington). There are alternating lane closures due to road construction work. There is a width limit in effect. Width limit 14'6". From 7:00AM CDT to 7:00PM CDT on weekdays. Until October 26, 2020 at about 1:00PM CDT.
Switch to Winter Driving Conditions
Switch to Road Reports
Truck Restrictions on US 34
Map of Reports on US 34 Between Nebraska State Line and I-29 (1 to 2 miles west of the Pacific Junction area). The right lane is closed due to road construction work. There is a width limit in effect. Width limit 12'0". Until September 30, 2020 at about 5:00PM CDT. Between County Road M16 (Hastings) and US 59 (Emerson). There are alternating lane closures due to road construction work. A pilot car is in operation. Look out for flaggers. There is a width limit in effect. Width limit 16'0". From 7:00AM CDT to 6:00PM CDT on weekdays and Saturday. Until April 23, 2020 at about 3:00PM CDT. Between Exit 244: County Road X23 (near New London) and the Mississippi River bridge (Burlington). A lane is closed intermittently due to road construction work. Until April 14, 2020 at about 1:00PM CDT. Between Exit 262B: Central Avenue and the Mississippi River bridge (Burlington). There are alternating lane closures due to road construction work. There is a width limit in effect. Width limit 14'6". From 7:00AM CDT to 7:00PM CDT on weekdays. Until October 26, 2020 at about 1:00PM CDT.
US 34 eastbound: Right lane closed, due to road construction work, width limit in effect. Width limit 12'0".
US 34 in both directions: Alternating lane closure, due to road construction work, pilot car in operation, look out for flagger, width limit in effect. Width limit 16'0".
US 34 in both directions: Alternating lane closure, due to road construction work, width limit in effect. Width limit 14'6".
Google Static Map Image
Closure Closure Restriction Restriction
See Road Reports for all closures