We've been listening to you. Try phase 2 of our updated 511 website and let us know what you think. X
Iowa DOT Logo IADOT ISP
US 18: Inwood - Rock Valley to Algona - Wesley
US 18 in both directions: Alternating lane closure, due to road construction work, pilot car in operation, look out for flagger, width limit in effect. Width limit 14'0".
Between County Road N18 (Ruthven) and IA 4 (Emmetsburg). There are alternating lane closures due to road construction work. A pilot car is in operation. Look out for flaggers. There is a width limit in effect. Width limit 14'0". From 7:00AM CDT to 7:00PM CDT on weekdays. Until October 8, 2020 at about 2:00PM CDT.
Switch to Winter Driving Conditions
Switch to Road Reports
Restrictions on US 18: Inwood - Rock Valley to Algona - Wesley
Map of Reports on US 18 Between County Road N18 (Ruthven) and IA 4 (Emmetsburg). There are alternating lane closures due to road construction work. A pilot car is in operation. Look out for flaggers. There is a width limit in effect. Width limit 14'0". From 7:00AM CDT to 7:00PM CDT on weekdays. Until October 8, 2020 at about 2:00PM CDT.
US 18 in both directions: Alternating lane closure, due to road construction work, pilot car in operation, look out for flagger, width limit in effect. Width limit 14'0".
Google Static Map Image
Closure Closure Restriction Restriction
See Road Reports for all closures