We've been listening to you. Try phase 2 of our updated 511 website and let us know what you think. X
Iowa DOT Logo IADOT ISP
Truck Restrictions on US 52
Map of Reports on US 52 Between River St; Iowa Ave (Sabula) and IA 62 (Bellevue). A lane is closed intermittently due to road construction work. A pilot car is in operation. Look out for flaggers. There is a width limit in effect. Width limit 9'0". From 6:00AM CDT to 8:00PM CDT on weekdays and Saturday. Until August 26, 2020 at about 4:00PM CDT. Between IA 32; County Road Y35 and US 61 (Dubuque). The roadway is reduced to one lane due to road construction work. There is a width limit in effect. A detour is in operation. Width limit 12'0". Until July 10, 2020 at about 5:00PM CDT. Between County Road Y13 (Holy Cross) and County Road C43 (Luxemburg). The road is closed due to road construction work. A detour is in operation. Until November 2, 2020 at about 12:00PM CDT.
US 52 in both directions: Intermittent lane closure, due to road construction work, pilot car in operation, look out for flagger, width limit in effect. Width limit 9'0".
US 52 southbound: Roadway reduced to one lane, due to road construction work, width limit in effect, detour in operation, see map for detour(s). Width limit 12'0".
US 52 in both directions: Road closed, due to road construction work, detour in operation, see map for detour(s).
Google Static Map Image
Closure Closure Restriction Restriction
See Road Reports for all closures