We've been listening to you. Try phase 2 of our updated 511 website and let us know what you think. X
Iowa DOT Logo IADOT ISP
Truck Restrictions on IA 14
Map of Reports on IA 14 Between County Road G76 and County Road G44 (Knoxville). The right shoulder is closed due to road construction work. Until August 15, 2020 at about 3:00PM CDT. Between IA 5 and County Road G44 (Knoxville). The roadway is shared with opposing traffic due to road construction work. There is a width limit in effect. Width limit 10'0". Until August 1, 2020 at about 3:00PM CDT. Between County Road F62 and County Road F48 (1 mile south of the Newton area). Expect single line traffic alternating directions due to bridge construction work. Look out for flaggers. Look out for temporary traffic lights. There is a height limit in effect. Until July 24, 2020 at about 4:00PM CDT. Between IA 96 (near Conrad) and IA 175 (3 miles south of the Grundy Center area). The road is closed due to road construction work. A detour is in operation. Until September 4, 2020 at about 4:00PM CDT.
IA 14 in both directions: Opposing traffic sharing the roadway, due to road construction work, width limit in effect. Width limit 10'0".
IA 14 in both directions: Single line traffic - alternating direction, due to bridge construction work, look out for flagger, temporary traffic light, height limit in effect.
IA 14 in both directions: Road closed, due to road construction work, detour in operation, see map for detour(s).
Google Static Map Image
Closure Closure Restriction Restriction
See Road Reports for all closures